Customization: | Available |
---|---|
Model: | 2X4m, 2.2X6m, 3X6m, 3.6X8m |
Object: | Sand |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Three-drum dryer is also called a three-cylinder dryer and a triple-drum dryer. It has improved the internal structure of the monocular dryer, which prolongs the time of pre-drying of wet materials and wet materials in the machine, thus improving 50% to 80% of production capacity compared with the original monocular dryer.
1. Steel plates are used between the three packages to effectively solve the problem of large wet sand accumulation due to package fixation.
2. The lifting plate is honeycombed and spirally propelled, which keeps the material in suspension and increases the exchange area between the material and the hot air.
3. K series hard gear reducer is durable, not easy to damage, and noiseless to start.
4. The roller ring is connected with the cylinder as a dovetail plate damping device, which avoids the risk of the cylinder being deformed at high temperature.
5. Waterway is installed under the supporting roller to solve the problem of damage caused by high temperature of the tugboat.
Model | Diameter of outer cylinder(m) | Length of outer cylinder (m) | Drum volume(m³) | Rotation speed(r/min) | Max. airflow temperature(ºC) | Production capacity(t/h) | Power(kw) |
2.0*4m | 2 | 4 | 12.56 | 4-10 | 700-750 | 8-15 | 5.5x2 |
2.2*5m | 2.2 | 5 | 18.99 | 4-10 | 700-750 | 12-20 | 5.5x2 |
2.5*6m | 2.5 | 6 | 29.43 | 4-10 | 700-750 | 18-28 | 7.5x2 |
2.8*6m | 2.8 | 6 | 36.92 | 4-10 | 700-750 | 25-35 | 11x2 |
3.0*6m | 3 | 6 | 42.39 | 4-10 | 700-750 | 30-40 | 7.5x4 |
3.0*7m | 3 | 7 | 49.45 | 4-10 | 700-750 | 30-45 | 7.5x4 |
3.2*7m | 3.2 | 7 | 56.27 | 4-10 | 700-750 | 35-55 | 11x4 |
3.6*8m | 3.6 | 8 | 81.39 | 4-10 | 700-750 | 55-75 | 18.5x4 |
4.0*10m | 4 | 10 | 125.60 | 4-10 | 700-750 | 70-100 | 22x4 |
The Three drum rotary dryer consists of a rotary body, throwing flitch, transmission device, supporting device, sealing ring, heat source, beater device, belt loading machine, feeding machine, rotary roller, belt discharger, draft fan, discharger, and switchboard. This 3-pass dryer has 3 drying zones in the 3 cylinders(internal one, middle one, and external one ) that construct the rotating body. Heat processing of a product with high moisture content is done efficiently in those 3 drying zones. The product is put in from the inlet of the hopper, sent to the internal cylinder where heating of the product is made, and then moves to the middle cylinder where evaporation of moisture is promoted further. The solid constituent of the product is gradually broken into pieces and discharged from the outlet via the third final drying zone. The hot air produced in the furnace is sent to the internal cylinder and passes through the middle and external cylinders. The hot air is then sent to the cyclone where dust is removed.
Baichy headquarters is located in the industrial park in Jiaozuo City. It covers a total area of 200,000 square meters, including 150,000 square meters of standardized workshops. There are more than 200 sets of various large and medium-sized metal processing lathes, riveting machines, welding equipment, and assembly equipment. We have more than 500 workers, including more than 20 middle and senior technicians. Baichy is mainly focused on 4 series of products: stone crusher machines, sand-making equipment, powder grinding mills, mineral processing equipment, and their spare parts. Every year, Baichy can turn out 1,000 sets of crushers and 10,000 tons of crusher parts.
1. Are you a manufacturing or trading company?
We are a factory, established in 2003.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at the lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete production line and give you related professional advice. We had already built many mining projects in China and overseas.